2010年6月2日 星期三

Final Project-Unit 202.2-Fish Market and Restaurant

Project Brief
In the final project, we are asked to design a fish market at Old Portsmouth the Camber which evokes its historic site. Throughout history Camber Harbour has been a busy well protected port and the site and its surroundings have been a dockyard, a fishing harbour, a coal depot and an array of warehouse. Today, the structure on the project site are the unattractive sheds of a wholesale and retail fish merchant. In the immediate surroundings today you will find a working fishing harbour, private boat moorings, residential developments, a bar/restaurant and car parks for the nearby ferry port.
The project seeks to address the issues outlined above by providing a fish market and fish restaurant which will attract visitors and contribute to the regeneration of the Camber harbour area. The market will be designed to bring together the fish retailers in and around the site. The market is to include a two-storey-height space with a main ground floor area for the fish market. There will be a veiwing gallery on the upper floor and this could also be a part of the retail market or ot could be linked with the fish restaurant.


Site analysis


In the previous weeks i tried to create a steel frame structure cladding with timber in the present site. I divided the spatial to two buildings. Main building in te north side is the office element and the secondary building in the south side the activity centre.

Planning diagram

Site Plan


After first time visited the site, I can said that if i didnt walk in to the market. I even dont know there is a fish market. The existing fish market is a unattractive block. People even dont know there is a fish market. So I want to create a building that even people dont walk in to it they can recognise that there is a fish market.

Conceptual drawing




My Design Schme i want to create the fishing market like the process of fishing. And the main element are Boats, Sail and fishing net. So the Main Building is boats and the Secondary building is a undulating roof coving the activity part( restaurant, chip shop and delicatessen.

Precedent


Ground Floor Plan

First Floor Plan
Concept model







Model


Subsequent Work after review

2010年6月1日 星期二

Unit 280-Field Trip(New York)

Study Trip 22/3/2010-26/3/2010


Study Field Trip with group of architectural student. We spent 5 days in new york it was my first to New York. We are all very excited and we have so much to do and see.
And we set up a website and we put all the information and analysis that each of us are giving buildings or places to be researched.

The place that I researched: Grand Central Terminal


23.3.2010
The way we are walking to chelsea market
Watertanks on top of the buildings,watertank are ubiquitous in New York city skyline, you can see it everywhere in new york.


Flatiron Building, 175 Fifth Avenue
One of the first skyscraper in New York. The building sits on a triangular island block at 23rd Street, Fifth Avenne and Broadway, anchoring the south end of Madison Square.


24.3.2010
Fire escape found on mulitiple-story residential for emergency use only. The ladder from the lowest level of the fire escape to the ground maybe fixed but more commonly it swings down on a hinge or slides down along a track.


Pedestrian Traffic Light
Walk or Dont Walk?!
Red Hand means Stop;
White Hand means Walk;
Red blinkd let you know that solid red hand imminent.

Newpaperstand in the street.

25.3.2010
The fourth day in New York, and the weather is amazing today ,warm and sunny. This is my first time visited the Grand Central Terminal. At first glance, Grand Central Sataion was an amazing sight to beholf\d the grandest of all the train staion's I' ve ever been to.


Look up to the sky, you can see lots of skycrapers in New York City. This is one of the icon in New York and it let me think about Hong Kong skyline.

26.3.2010
Last Day, Central Park is an urban park in the heart of Manhattan in new York.



Unit211-Architectural Technology Environmental (IES Workshops)

Unit 211 Model IT IES (Integrated Enviromental Solution)





Radiance
15th December,3:00pm-standard overcast sky


15th June,3:00pm-clear sky


15th June-3:00pm-clear sky